We are experienced in modular plant design and delivery for gold, copper, base metals, iron ore, coal, mineral sands and ore crushing and screening applications with a proven track record for actual design, construction and operations of this industry leading modular plant range.
Flexibility, efficiency, cost effectiveness and timeliness have been the drivers for developing our five generations of modular processing plants.
Our fifth-generation modular plants have been designed for gold and copper and base metals ores. The modular gold plant contains comminution, gravity separation, leaching, gold recovery, cyanide detoxification, dry stack tailings and power generation modules.
The modular copper and base metals plants incorporate several stages of froth flotation using a combination of column and conventional flotation cells. This latest plant evolution also incorporates our SEDGMETRIX platform - plant monitoring technology, linking advanced instrumentation, Wi-Fi backbones, cloud connection between SCADA and mobile dashboard reporting system – all providing improved efficiency and advanced control, monitoring and reporting diagnostics.
Our first, second and third generation plants were developed for the coal industry in Indonesia and Australia. They were small 200-300 t/h plants and deployed to the Petangis, East and West Senakin, and Blair Athol Mines. The fourth generation took the size and engineering advancement to the next level – 550 t/h plants were installed at the Byerwen coal mine (2017 and 2019) and fully modular mineral sands plant was delivered and installed in Florida, USA. Throughout this continuous innovation journey our structural, concrete and electrical designs constantly evolved and improved based on practical experience to provide further modularisation benefits, maximising the amount of off-site preassembly and fit out of all mechanical and electrical equipment. The most recent addition to the Byerwen mine modular plant evolution incorporates a tailing’s filtering and disposal system (2021/22) – again building on our advanced modularisation engineering and construction expertise. The benefits of reduced cost, site time, improved safety outcomes (less working at heights and exposure to high-risk construction work and reduced site labour) continue to be demonstrated to our clients. The Byerwen mine modules were erected in 10 days – this achievement was captured by our time lapse camera.
Modules are fully preassembled including modules being fabricated and assembled prior to disconnection, wrapping and shipping. Modular designs can also be suitable for relocation and include significantly lowered concrete volumes, improving embedded carbon emissions of our designs. Cold weather requirements can also be incorporated into any of our modular plant designs.